For RWAs and society committees
Cut your society's common-area electricity bill in Karnataka — together.
Lifts, pumps, lobby, parking lights. Lower society maintenance for every flat.

How it works
From first conversation to switch-on.
Free site visit & energy audit
We study the rooftop layout, common-area load profile, and last 12 months of electricity bills.
Proposal & AGM-ready package
We share a detailed proposal your committee can circulate ahead of the AGM.
Approval & subsidy filing
Once the AGM passes, we file the discom paperwork, structural NOCs, and PM Surya Ghar subsidy claim in parallel.
Install with minimal disruption
Lift access, water tank routing, and parking — coordinated with your facility manager.
Switch on. Save. We maintain.
System goes live, common-area bills drop the same month, and we handle 5 years of cleaning + monitoring + parts.
Choose what fits
Which solar system suits your housing society?
Not sure which is right? Our team will help you decide on the call.
- On-Grid
Stay connected, sell extra power
- Off-Grid
Be fully independent with batteries
- Hybrid
Best of both — power + backup
Why us
Why society committees pick Irradiant.
Committee-ready proposals
Detailed savings model, payback timeline, and financing comparison — formatted to circulate to all flat owners.Fair to every flat
We model the per-flat impact on monthly maintenance so committees can show it transparently.Built for shared rooftops
Water tanks, AC condensers, lift machine rooms, cell towers — we design around them with elevated mounts.
Society questions, answered
Housing society FAQs
Still have questions?
We'll send you a detailed proposal you can circulate to your committee.
Yes — under PM Surya Ghar Muft Bijli Yojana, group housing societies are eligible for a central subsidy of ₹18,000/kW (capped at the relevant slab) on qualifying common-area / shared-use capacity.
It's tied to the society's total approved capacity, not per flat. We figure out the exact eligibility during the site visit.
We handle the application — society registration on the National Portal (pmsuryaghar.gov.in), document submission, technical feasibility check, and post-installation claim filing. The society only needs to provide standard paperwork (registration certificate, electricity bill, AGM resolution, building approval).
Yes. As a structural change to the building and a corpus / common-area decision, solar installation requires a formal resolution passed in the Annual General Meeting (or a duly-convened Special General Meeting). The resolution should specify the capacity, financing model, and authorisation for the society committee to sign the contract on behalf of the society.
- Initial committee discussion based on our preliminary site survey + savings estimate.
- We share a detailed proposal: system size, financial model, savings forecast, vendor credentials.
- Society committee circulates the proposal to all members (typically 2–4 weeks notice).
- AGM / SGM passes the resolution authorising installation.
- Society signs the agreement with us.
Approval to signed contract usually takes 30–60 days, depending on how quickly the society can convene the AGM.
PM Surya Ghar Muft Bijli Yojana is the central government's flagship rooftop solar scheme launched in 2024. For housing societies it provides:
- Capital subsidy of ₹18,000/kW for the society's qualifying common-area capacity (subject to scheme caps and updates).
- A simplified single-window registration on the National Portal.
Societies have to register the proposed system, get a technical feasibility approval from the local discom, install via an empanelled vendor, and the subsidy is disbursed post-inspection.
Rough rule: about 100 sq ft per kW of installed solar.
Water tanks, pump rooms or AC condensers in the way? Elevated mounting structures recover the area underneath. The site visit maps exactly what fits.
Ready to see your savings?
Free site visit. Free quote. Zero pressure.