For businesses
Solar for your business in Karnataka — predictable energy costs, lower bills.
Shops, offices, schools, factories, warehouses. We design for your roof, your load curve, and your tariff.

How it works
From load study to switch-on.
Free site visit & load study
We study your last 12 months of bills, sanctioned load, demand profile, and rooftop / open-area availability. The proposal is sized to your actual consumption.
CAPEX vs OPEX financial model
We build a side-by-side: payback, IRR, NPV, and balance-sheet treatment.
Approval, financing & paperwork
Discom approval, structural certifications, and net-metering paperwork — all on us.
Install around your operations
Grid-tie cutover happens in a single 2–4 hour planned window, weekend or off-peak — your choice.
Switch on. Save.
System goes live, savings start the same month.
Choose what fits
Which solar system suits your business?
Not sure which is right? Our team will help you decide on the call.
- On-Grid
Stay connected, sell extra power
- Off-Grid
Be fully independent with batteries
- Hybrid
Best of both — power + backup
Why us
What a business gets with Irradiant.
- 01
Designed for your roof
We measure the roof, check shading and load, then size the system to your bill. - 02
Transparent proposal
Clear estimates for production, cost, warranty and timeline. - 03
Brands you can check
Panels, inverters and batteries from makers such as Waaree, SMA and Dyness. - 04
One team, end to end
Site visit, design, installation, paperwork and support, all by Irradiant. - 05
Digital monitoring
Visibility into generation and system health over time. - 06
Long-term support
Service thinking that continues beyond project handover.
Business questions, answered
Commercial solar FAQs
Still have questions?
Commercial decisions deserve real numbers.
Yes. We help compile the financial dossier (system DPR, savings projection, payback model) the bank will need to approve.
Rooftop is the default — uses unutilised roof area, no land cost, shorter approval cycle.
Ground-mount makes sense when the roof can't carry or fit the system you need, or when you have plenty of unused ground or parking area. Typical for larger industrial campuses (>500 kW) or facilities with adjacent open land.
The grid-tie / commissioning step needs a single 2–4 hour planned shutdown, which we schedule on a weekend or off-peak window of your choice.
We coordinate the timeline with your facility manager, including discom inspection, net-metering changeover and final go-live.
Ready to see your savings?
Free site visit. Free quote. Zero pressure.